NIST SP 800-30 defines the terms a risk assessment depends on, and says organizations should document them before assessing. A threat is any circumstance or event with the potential to adversely impact operations, assets, people or other organizations through a system, by unauthorized access, destruction, disclosure or modification of information, or denial of service. A threat event is caused by a threat source. The guide groups sources into hostile cyber or physical attacks, human errors, structural failures of equipment or environment, and natural or man-made disasters and accidents.

A vulnerability is a weakness in a system, in security procedures, in internal controls or in how something is implemented, that a threat source could exploit. The guide adds that vulnerabilities are not only technical: they can be found in governance, in external relationships such as supply chains, and in business processes. A predisposing condition is a condition that increases or decreases the likelihood that a threat event, once started, causes harm. Its examples are a facility in a flood-prone area, which raises the likelihood, and a system with no external network connection, which lowers the likelihood of network attacks.

Likelihood and impact make the risk

SP 800-30 says risk is a function of the likelihood of a threat event occurring and the potential adverse impact if it does. Likelihood is assessed for a stated time frame, such as the next year. For attackers, the guide says it is typically based on the attacker's intent, capability and targeting. For accidents and natural events it is estimated from historical evidence and other data. It also separates two parts: the likelihood the event starts, and the likelihood that, once it starts, it causes harm. The overall likelihood combines them.

A risk, then, is a sentence you could argue with: a named threat, acting on a named weakness, against a named asset, with a likelihood over a stated period and an impact. NISTIR 8286 says risk descriptions in a register are often written in a cause and effect form such as 'if X occurs, then Y happens'. That form is a useful check: if you cannot finish the sentence, you do not yet have a risk, only a worry.

Three ways to put numbers on it

SP 800-30 describes three approaches and is even-handed about them. Quantitative assessment uses real numbers and best supports cost-benefit comparison of responses, but the guide says the meaning of the results may need explaining and the rigor drops when subjective judgments are buried inside the numbers or the uncertainty is large. Qualitative assessment uses levels such as very low to very high, which communicates well to decision makers, but the range is small, so ranking risks against each other is hard, and different experts can rate the same thing differently unless each level is clearly defined or illustrated.

Semi-quantitative assessment uses bins or scales, for example 0 to 100 grouped into bands, so scores translate into words for communication while still allowing comparison. The guide says the repeatability of qualitative ratings improves when each value is annotated with the reasons for it and when well-defined tables are used to combine values. Its own examples combine two five-level ratings, likelihood of initiation and likelihood of harm, in a table to give an overall likelihood.

The practical lesson is that a matrix is a communication tool, not a measurement. The labs in this unit let you test that yourself: one rates five risks in ten minutes, and one shows what a five by five matrix does to a set of simulated risks.

Where the assessment sits

SP 800-39 describes risk management as four parts: frame, assess, respond and monitor. The assessment part is the one in this unit. Framing comes first and produces the assumptions, constraints, risk tolerance and priorities that the assessment then relies on, so two organizations can rate the same event differently and both be right. SP 800-30 notes that risk is looked at in three tiers: the organization, its mission or business processes, and individual information systems.

CSF 2.0 puts the same work in its IDENTIFY function. Its risk assessment outcomes include identifying and recording vulnerabilities in assets, receiving cyber threat intelligence, identifying internal and external threats, recording potential impacts and likelihoods, and using threats, vulnerabilities, likelihoods and impacts to understand inherent risk and prioritize responses. 'Inherent' means the risk before the organization takes any direct action to change it; the next unit covers what is left afterwards.

Key points

Sources

Lecture

Secure by design and threat modeling: A talk on finding what can go wrong early, which feeds the threat and weakness lists you build here.

Practice in the labs

Rate a few risks quickly, then see how the rating method itself can mislead.

Knowledge check

  1. In NIST SP 800-30, which of these is a vulnerability? Answer: A weakness in a system, procedure or control that a threat source could exploit. SP 800-30 defines a vulnerability as a weakness in a system, security procedures, internal controls or implementation that could be exploited by a threat source.
  2. A server room is in a flood-prone area. SP 800-30 would call the flood-prone location what? Answer: A predisposing condition. SP 800-30 gives a facility in a hurricane or flood-prone region as an example of a predisposing condition, because it raises the likelihood of harm once a flood starts.
  3. Why should a likelihood rating state a time frame? Answer: Because something near-certain next year may be unlikely in a week, and the rating means nothing without a period. SP 800-30 says likelihood is assessed with respect to a specific time frame, for example the next six months or the next year, so the rating has a clear meaning.
  4. What does SP 800-30 say can make qualitative ratings repeatable? Answer: Annotating each value with reasons and using well-defined tables to combine values. The guide says annotating assessed values (this is high because of the following reasons) and using tables or other well-defined functions increase repeatability and reproducibility.