Running the program: roles, change control and baselines
Unit 2 of 5 in Building a security program.
You will be able to say who is accountable, how a change is approved and recorded, how to pick and tailor a baseline of controls, and how to put patching into a queue.
Lesson
Who is accountable
The CSF 2.0 GOVERN function puts accountability first. GV.RR-01 says organizational leadership is responsible and accountable for cybersecurity risk and fosters a culture that is risk-aware, ethical and continually improving. GV.RR-02 says roles, responsibilities and authorities are established, communicated, understood and enforced. GV.RR-03 says adequate resources are allocated in proportion to the risk strategy, roles, responsibilities and policies. GV.RR-04 says cybersecurity is included in human resources practices.
Read as a checklist for a small organization: someone senior is named as accountable, each control has an owner who knows it, there is time and money for the work, and hiring, onboarding and leaving include security steps. A program with a policy and no owner is a document.
Change control
SP 800-53's CM-3 asks organizations to determine and document which types of changes to a system are configuration-controlled; to review proposed changes and approve or disapprove them with explicit consideration of security and privacy impact; to document the decisions; to implement approved changes; to keep records of changes; to monitor and review activity related to changes; and to coordinate oversight through a body that meets on a schedule or when conditions require. Its discussion lists Configuration Control Boards and Change Advisory Boards as the usual way, and says auditing of changes includes activities before and after the change.
The change management lab has you write a complete request for change for a security change, classify it as standard, normal or emergency, write a rollback plan with a go or no-go decision point, run a board decision and record it, and close with a post-implementation review. It teaches that an emergency change still gets documented afterward, and that a board that approves everything is not a control.
Baselines and tailoring
SP 800-53 describes control baselines as predefined sets of controls assembled for the protection needs of a group or organization, chosen to meet mandates or address threats common to the users of the baseline. It says baselines are a starting point, with later tailoring to manage risk in line with mission, business or other constraints, and that the federal baselines now live in SP 800-53B, which this class did not open. Selection depends on stakeholder needs, including the requirements of laws and regulations.
You do not need the federal baselines to use the idea. Start from a published set that fits your size, such as the CIS Controls or the framework you chose in Risk management basics, then write down for every control you drop or change why that is acceptable. The baseline lab walks the NIST version of this: restate the impact level, pick the matching baseline, apply overlays, scope it to the real system and write a tailoring decision record. Tailoring is a decision to record, not a way to quietly skip work.
Putting patching into a queue
SP 800-40 recommends assigning each asset to a maintenance group, using the asset's characteristics and the risk response scenarios, at whatever level of detail the organization finds best. A group might be workstations that can restart on a schedule, or servers that must be patched in a window, or devices that cannot be patched at all. The group sets which plan applies, including the emergency one.
The vulnerability program lab builds the portfolio layer on top of that idea: a small asset inventory with criticality tiers, a script that combines four signals into a priority bucket and a deadline for each finding, a measure of how many met their deadline, and a register of exceptions. It is an advanced lab; its point is that the same flaw is a different risk on a different machine.
The cyber insurance lab shows how an outside party grades the same baseline: you fill a readiness worksheet of control, in place, evidence and gap for an environment you choose, and use the gaps to make a remediation list before anyone else asks.
Key points
- Name an accountable leader, give each control an owner and fund the work; include security in HR steps.
- Change control means: types defined, review with security impact, documented decision, records and a board that meets.
- A baseline is a starting point; record every tailoring decision and why.
- Group assets by how they can be maintained, and give each group a patching plan including an emergency one.
Sources
- NIST CSWP 29: The NIST Cybersecurity Framework (CSF) 2.0
- NIST SP 800-53 Rev. 5: Security and Privacy Controls for Information Systems and Organizations
- NIST SP 800-40 Rev. 4: Guide to Enterprise Patch Management Planning
Practice in the labs
Run a change through control, tailor a baseline, build a risk-based patch queue and fill an insurer-style readiness worksheet. Desk labs and one script lab on synthetic data.
- Run a Change Management Process for a Security Change: You write a request for change for an urgent firewall rule, classify it, write the rollback plan and run the board decision, including the emergency path.
- Select and tailor a control baseline (NIST RMF Step 2): You pick the baseline that matches an impact level, apply overlays, scope it to a system and write a tailoring decision record.
- Build a risk-based vulnerability-management program (tiered remediation SLAs): You fuse severity, likelihood, known-exploited status and asset criticality into priorities and deadlines, then measure attainment and keep exceptions. It is an advanced lab.
- Get ready for cyber insurance: work an insurer's security questionnaire: You fill a readiness worksheet for an environment you choose and turn the gaps into a remediation shortlist.
Knowledge check
- Which CSF 2.0 outcome says leadership is accountable for cybersecurity risk? Answer: GV.RR-01. GV.RR-01 says organizational leadership is responsible and accountable for cybersecurity risk and fosters a risk-aware, ethical and continually improving culture.
- In SP 800-53's CM-3, what must be considered when a proposed change is reviewed? Answer: Security and privacy impact. CM-3 asks that proposed changes be approved or disapproved with explicit consideration for security and privacy impact analyses, and that the decisions be documented.
- SP 800-53 says baselines are a starting point. What follows? Answer: Tailoring to manage risk in line with mission and other constraints. The discussion of baseline selection says baselines represent a starting point for protection with subsequent tailoring actions to manage risk in line with mission, business or other constraints.
- Why group assets into maintenance groups, according to SP 800-40? Answer: So each group gets a patching plan that fits how it can be maintained. SP 800-40 assigns assets to groups based on their characteristics and the risk response scenarios, so routine, emergency and unpatchable assets each get a suitable plan, not one plan for everything.
Back to the syllabus or see all classes.
Related
- Building a security program
- Run a Change Management Process for a Security Change
- Select and tailor a control baseline (NIST RMF Step 2)
- Build a risk-based vulnerability-management program (tiered remediation SLAs)
- Get ready for cyber insurance: work an insurer's security questionnaire
- All classes
- Free cyber labs